2019-12-02 07:56:04 By:NVirotech Bolted Tank (1775)
bolted tank installation should strictly follow the installation steps, so as to ensure the normal operation of bolted tank. Today, I will introduce the bolted tank installation steps.
bolted tank installation before, it is necessary to check whether all the parts are complete or not, and replace them in time if there is any defect. Fixed the bolted tank body on the bracket or the specific support to find the level with the level meter.
Soft cushions, such as rubber sheets or sheepskin cushions, which do not affect the quality of enamel, are laid on the bottom of the enamel reactor, and then the stirring is slowly put into the tank and placed on the top of the cushion.
bolted tank installation at the mouth of the pot and fitted with tetrafluoro gaskets. When filling the pot cover, the sealing surfaces between the pot cover should be prevented from colliding with each other. When tightening the main nut, it must be tightened diagonally and symmetrically for many times. The force should be uniform and the cover should not be inclined to one side to achieve good sealing effect.
Uniform and symmetrical latch on the clip equipped with enamel reactor, and then install mechanical seal or packing box. Install the reducer, first open the wind blade shell of the reducer, put the stirring in position, rotate the wind blade of the motor, connect the stirring shaft with the reducer, install the anti-loosening ring and lock the anti-loosening nut, and all the nut threaded joints should be lubricated when assembled.
Install the thermometer, remove the protective straw rope on the stirring and rotate it to see if the stirring touches the thermometer and the cylinder.
Install glass-lined discharging valve and screw the handwheel to the bottom before installing the bottom valve to ensure that the Teflon orifice plate is in the correct sealing center position.
If the tetrafluoroorifice orifice plate is misaligned during installation, the tetrafluoroorifice orifice plate will not be concentric with the valve core. The filler in the bottom valve should be pressed regularly, and the mechanical part of the valve should be refueled regularly.
In the installation of glass-lined pipes and glass-lined tower joints, tetrafluoro gaskets should be added at the joints, which is conducive to the sealing of the nozzle and avoids the damage of the enamel surface under mechanical pressure.
bolted tank installation is finished, all kinds of parts and pots should be carefully inspected, and empty trial run can be carried out after confirmation of the correctness. bolted tank installation should strictly follow the steps described above, which is also the premise to ensure its normal operation, thus creating higher value for us.
write down your requirement and contact details in the following form to get the latest price of this product within one day!
Hi, we intend to sell this website, if you are interested, please contact us:
Email:529733977@qq.com